top of page
PURLIFT LATEST
CASE STUDIES

Jacob Villeneuve
Feb 131 min read
Case Study - École Boileau
Project: Lift, level, and stabilize a concrete slab of approximately 1,730 square feet. Installer: Purlift Inc. Engineering Firm:...
2 views

Jacob Villeneuve
Feb 112 min read
Case Study - Police Station
Project: 6,300 square foot police station with adjacent public security office and fire station had sunk up to three inches. Installer:...
3 views

Jacob Villeneuve
Feb 111 min read
Case Study - Shopping Mall
Project : 73,000 square foot shopping centre sunk up to 6”. Installer : Lève-Béton PURLIFT Challenge :...
3 views
bottom of page