Project: 73,000 square foot shopping centre sunk up to 6”. Installer: Lève-Béton PURLIFT Challenge: The shopping mall was built in 2010 on...
Project: 73,000 square foot shopping centre sunk up to 6”. Installer: Lève-Béton PURLIFT Challenge: The shopping mall was built in 2010 on...
Project: 6,300 square foot police station with adjacent public security office and fire station had sunk up to three inches. Installer:...
Project: Lift, level, and stabilize a concrete slab of approximately 1730 square feet. Installer: PURLIFT INC. Challenge: The Boileau School had experienced...